Providing Survey Support during construction of Four Laning of works (with paved shoulders) of Bareilly -Almora section of SH-37, in state of Uttar Pradesh on DBFOT Basis for TEAM UNIVERSAL INFRATECH PRIVATE Ltd.
Providing Survey Support during construction of Four Laning of Deoli-Kota section of NH-12 from Km 165+000 to Junction of NH-76 on Kota Bypass in the State of Rajasthan for TEAM UNIVERSAL INFRATECH PRIVATE Ltd.
Pre-construction Survey for Four Laning of Deoli-Kota section of NH-12 from Km 165+000 to Junction of NH-76 on Kota Bypass in the State of Rajasthan for GVK Projects and Technical Services Ltd (40 kms)
The topographic surveys for the Chomu-Mahala Road starts from Km.268/00 of NH-11 (Harota) and ends at Km.301/200 of NH-8 (Mahala). It passes through the major towns Renwal, Pachkodiya and Jobner. The Project connects 4 major towns Chomu, Renwal, Jobner and Mahala of District Jaipur. Total Length is 82.272 Kms for CES - PUNE.
Providing Survey Support during construction for Six Laning of Vijaywada - Chilkuripet (NH-5) project for M/s EDIFICE INFRASTRUCTURE Ltd.
Providing Survey Support during construction for Construction of GOLF LINK Project ,High Rise Residential Buildings, at Ghaziabad for TEAM UNIVERSAL INFRATECH PRIVATE Ltd.
Total Survey Work for Four Lanning of NH 1A from Jammu to Udhampur in state of
Jammu and Kashmir approx length 65 Km for CES - Delhi
Providing Survey Team on monthly basis to DMRC for construction of Badarpur line.
"SETTING OUT OF BUILDINGS (GRIDS) to be conducted for our GOLF LINKS PROJECT , GHAZIABAD" - for TEAM UNIVERSAL INFRATECH PVT. LTD.
DIGITAL LEVEL SURVEY FOR Ballastless Track work at different sections of DMRC contract BT-7 - for TEAM UNIVERSAL INFRATECH PVT. LTD. (10000track meter)
Topographical Survey and Setting out works at Bhogpur - Mukerian at NH-1A project in the state of Punjab from Km 26.00 to km 70.00 - for IVRCL INFRASTRUCTURE PROJECTS LTD. (44kms)
Topographical Survey for International Agriculture market at GANUR for Haryana State Agriculture Marketing Board - 500 Acres.
SETTING OUT OF BUILDINGS (GRIDS) to be conducted for our Prestige South Ridge Project - Bangalore, for a stretch of 9.2 Acres Land of Banshankari 3 Stage" - for TEAM UNITED ENGINEERS (INDIA) Pvt. Ltd.
Construction of Elevated Viaduct and Dhula Kuan Station for Airport Metro Express Line - Contract AMEL - C2 - Survey work for IJM (India) Infrastructure Limited.(7.6kms)
Pre-Construction Survey for Widening & Strengthening of existing four lanes to Six lanes of road section in Vijaywada - Chilkuripet (NH-5). for IJM (India) Infrastructure Limited.(84kms)
Topographical Survey of Proposed Cement Plant for Vishamber Cement Ltd. -509 acres
Pre-construction Survey for Widening & Strengthening of existing two lanes to four lanes of road section in Bhopal - Dewas (SH-18). for IDEBI,Bangluru.(107 kms)
Construction Survey for Township Project - RTP FIRST CITY, Nagpur for IJM (India) Infrastructure Limited. (34 Acres)
Topographical Survey for the proposed ROB at Sanjeevaiah Park for MELTEC Infratructure Enginners Ltd. (2 kms)
Topographical Survey For KSTP -1 Project in Kerla for PATTI-BEL JV. (80 kms)
Construction Survey for Widening & Strengthening of existing two lanes to four lanes of road section in Ulunderpet - Padalur (NH-45) from Ch.238.4 to Ch.285. for IJM (India) Infrastructure Limited.(47 kms)
Pre-construction Survey for Widening & Strengthening of existing two lanes to four lanes of road section in Ulunderpet -Padalur (NH-45) from Ch.191 to Ch.285. for Trichy Tollway Private Limited.(94 kms)